Area guide, East Midlands

    Commercial solar for Nottingham buildings

    Nottingham combines two substantial university estates, a large private student accommodation sector, a professional office core and a distribution fringe on the motorway corridor. It is also a city with a long standing and publicly stated carbon commitment, which changes how institutional and public sector buildings here appraise a project.

    Every installer in our network is NICEIC approved for electrical work, and MCS certified for systems up to 50kW. See how we vet installers

    01

    Your distribution network operator is National Grid Electricity Distribution

    Nottingham is in the East Midlands licence area of National Grid Electricity Distribution, formerly Western Power Distribution and before that East Midlands Electricity. The names change, the network does not.

    A commercial array requires a G99 application and approval prior to energisation. The operator publishes capacity information by area, which is the right place to start on a scheme large enough that export could be questioned.

    On most city buildings, where consumption is substantial and export is limited, capacity is not the binding constraint. It becomes one on large roofs attached to modest loads, which is where an export limitation device earns its cost.

    02

    The university and student accommodation estate

    Between the two universities and the private accommodation operators, a very large share of the city's non domestic floor area is education related. Teaching buildings, laboratories, sports centres, catering and residential blocks all behave differently and should not be treated as one estate.

    Laboratory and catering buildings hold high year round base load and are the best candidates. Residential blocks offset the landlord supply, which carries lighting, lifts, ventilation and hot water regardless of whether the rooms are occupied.

    The seasonal mismatch on student housing, where the emptiest months are the sunniest, matters less than it appears for exactly that reason. It is the communal supply the array is displacing.

    03

    Public sector and civic buildings

    Nottingham's civic estate operates against a published carbon target, which brings a different appraisal discipline. Business cases are scrutinised, procurement is formal and the measurable carbon reduction carries weight alongside the financial return.

    For public bodies the procurement route often matters as much as the technology, whether that is a framework, a tender or a funded arrangement. We can set out the options, but the compliant route is a decision for your procurement team.

    Measured data matters more here than elsewhere, because reported reductions need evidence. Monitoring should be specified as part of the installation rather than added afterwards.

    04

    Offices, retail and the distribution fringe

    The professional office core has the usual weekday daytime profile and the usual plant crowded roofs, so usable area is the question rather than whether the load matches.

    Out towards the motorway corridor the building type becomes large single storey distribution, which the East Midlands has in quantity because of its position on the national road network. Big roofs, simple structures, and a load that varies enormously between a cross docked unit and an automated or chilled one.

    Where a distribution site plans fleet or van charging, that changes the case decisively, turning surplus generation into self consumption. Size the array with the charging plan rather than before it.

    05

    How NRG Solar works in Nottingham

    NRG Solar has no East Midlands office. We assess the building nationally, model it against your consumption and match you with one vetted installer working in the region.

    For institutional and public estates we would normally suggest starting with a portfolio ranking rather than a single building, because the best two or three buildings usually carry most of the available benefit.

    The assessment is free, indicative and obligation free.

    Network operator for Nottingham

    Connections in this area are approved by National Grid Electricity Distribution, licence area East Midlands. Your distribution network operator is not your electricity supplier, and a commercial array needs their approval under the G99 process before it can be energised.

    NRG Solar has no office in Nottingham. We operate nationally and match you with a vetted installer working in the area, which is how the local knowledge above reaches your roof.

    05Free assessment

    Size it for your own building

    Five questions about your roof and your electricity. We ask for your name last, and you see indicative figures either way.
    1. 1. Postcode
    2. 2. Your roof
    3. 3. Energy use
    4. 4. Interests
    5. 5. Your details

    06Questions

    Frequently asked questions

    Find out what your roof would deliver.

    Get Your Free Estimate