    Putting spare land to work as generation

    Where a business owns land next to its site, a ground mounted array can be larger, better oriented and easier to maintain than anything the roof allows. The trade offs are planning, the grid connection and the land itself, all of which need settling before any panel is ordered.

    Every installer in our network is NICEIC approved for electrical work, and MCS certified for systems up to 50kW. See how we vet installers

    01

    When ground mount is the right answer

    Ground mounted arrays suit organisations with spare land next to a meaningful electrical load: manufacturing sites, farms, depots, water and waste operations, and larger public estates. They avoid roof constraints entirely and allow the array to be sized to the load rather than to the building.

    Orientation and tilt can be optimised, access is straightforward, and maintenance costs are lower than working at height. Where land is genuinely spare, cost per kilowatt can be competitive with rooftop.

    The constraints move from structure to land use, consent and connection, all of which take longer to resolve than a roof survey.

    02

    Planning and land considerations

    Ground mounted solar of any scale normally requires planning permission. Authorities will consider agricultural land classification, landscape and visual effect, ecology, flood risk, heritage setting and cumulative impact with other schemes.

    Best and most versatile agricultural land attracts particular scrutiny, and applications on poorer grades or previously developed land generally have an easier route. Community and neighbour engagement is worth doing early.

    Biodiversity requirements now shape scheme design, and a well designed array with sheep grazing or wildflower planting between rows can improve the ecological position rather than damage it.

    03

    Grid connection is usually the critical path

    For anything sizeable, the connection determines the project. The application to the distribution network operator establishes whether capacity exists, what conditions apply and whether reinforcement is needed, and the answer can change both the size and the viability of the scheme.

    Lead times can be long and quoted reinforcement costs can be substantial. Establish the connection position before spending significantly on design, and treat the offer rather than the assumption as the basis for the business case.

    Where export capacity is limited, sizing the array to on site consumption with export limitation is often the pragmatic route to a scheme that can actually be built.

    04

    Design, security and maintenance

    Piled or ground screw foundations suit most sites and avoid concrete, with the ground investigation determining which. Row spacing balances land use against self shading and access for maintenance.

    Ground level equipment is exposed to theft and vandalism, so fencing, lighting, cameras and cable security are part of the design and part of the insurance conversation.

    Vegetation management is a real operating cost. Grazing, mowing regimes and access tracks should be planned rather than improvised after the first growing season.

    05

    Cabling, metering and the route to the load

    The cable route from the array to the point of connection is a cost item in its own right, particularly where it crosses land you do not control, in which case wayleaves or easements are needed.

    Metering must record generation, consumption and export correctly, with the arrangements registered before energisation if export is to be paid for.

    NRG Solar assesses the opportunity and matches you with installers experienced in ground mounted work. The design, consents and construction are delivered by the installer under contract with you.

    Estimate it for your own building

    Draw your roof in the free assessment below and we will show an indicative system size, generation, saving and payback before anyone visits site.

    05Free assessment

    Size it for your own building

    Five questions about your roof and your electricity. We ask for your name last, and you see indicative figures either way.
    1. 1. Postcode
    2. 2. Your roof
    3. 3. Energy use
    4. 4. Interests
    5. 5. Your details

    06Questions

    Frequently asked questions

    Find out what your roof would deliver.

    Get Your Free Estimate